FCA-registered UK lender FRN 782472 (opens the FCA register in a new tab)

Energy & renewables finance

Fund equipment and installers before customers pay.

Bridge equipment, labour and commissioning costs while completed installations wait for payment.

EnergySector at a glance

Illustration
Schematic of a solar array, wind turbine and battery cell

Energy & renewables at a glance

Likely route
Invoice finance or trade finance
Information needed
Installation contracts, commissioning certificates, invoices, handover sign-off, customer approval evidence
Main pressure
Equipment and labour costs before commissioning sign-off
Assessment
Individual circumstances and underwriting apply.
£50,000
Could be paid to you, day 1–2
£45,000
When your customer pays
£4,000

On a £50,000 invoice on 30-day terms: £45,000 advanced at 90%, £4,000 when your customer pays, a fee of about £1,000.

Illustrative only: up to 90% advanced, a fee of about 2%. Schematic of a solar array, wind turbine and battery cell - a schematic drawn by Cashbook Finance, not a client, site or transaction.

Check eligibility
£30m+
Funded since 2019
90%
Advanced against approved invoices
24–48h
Typical funding after setup
100+
UK businesses since 2019

Energy & renewables finance

Where the cash gets stuck.

  • Cash-flow cycle

    Where the pressure develops

    Equipment and labour costs before commissioning sign-off can create a gap between delivery, operating costs and the date customers actually pay.

  • Documents

    What helps assessment

    Installation contracts, commissioning certificates, invoices, handover sign-off, customer approval evidence help make the first funding discussion specific rather than exploratory.

  • Structure

    What the facility should achieve

    The structure should match the trading cycle, debtor quality and repayment route rather than simply chase a product label.

Sector-specific discussion

Bring customer terms, expected funding cycle, supporting evidence and any existing finance arrangements to the call.

Talk it throughView funding scenarios

Sector detail

Where funding fits an energy or renewables business.

Evidence that matters

Commissioning and handover sign-off

Invoices raised after commissioning, backed by signed handover certificates and grid-connection or test records, are the cleanest part of an energy ledger.

What strengthens the case

Commercial customers on agreed terms

Billing businesses, developers and public bodies on agreed terms - rather than consumers or subsidy claims - keeps more of the ledger eligible.

What can limit funding

Retentions, stage claims and subsidy timing

Contractual retentions, uncertified stage applications and payments that depend on grants or export tariffs are hard to fund and usually sit outside availability.

An illustrative example

A commercial solar installer invoices £150,000 a month on commissioning with signed handover certificates, while paying for panels, inverters and installation crews weeks earlier. Illustratively, invoice finance advances up to 90% of each commissioned invoice, with retentions and uncertified stage claims simply excluded from availability rather than blocking the facility. Illustration only - every facility depends on individual assessment and underwriting.

Check eligibilityAbout 2–3 minutes, no credit search.

Common questions

Questions about energy and renewables funding.

  • Which funding route usually fits energy and renewables businesses?

    Usually invoice finance, with trade finance where equipment must be paid for before installation. Funding is strongest once an installation is commissioned and signed off, not while it awaits testing or connection.

  • What evidence helps an energy and renewables funding assessment?

    Contracts, purchase orders, commissioning certificates, handover sign-off, project margin and debtor ledger. Invoices raised after commissioning, backed by signed handover certificates and grid-connection or test records, are the cleanest part of an energy ledger.

  • What can limit or slow energy and renewables funding?

    Uncommissioned work, connection delays, performance guarantees and excessive customer concentration. Contractual retentions, uncertified stage applications and payments that depend on grants or export tariffs are hard to fund and usually sit outside availability.

Talk it throughBring the customer terms and the funding cycle.

Sector underwriting

Energy and renewables funding: what the assessment needs to understand.

  1. 1

    Cash-flow pattern

    Equipment lead times, staged installation and commissioning sign-off

  2. 2

    Evidence to prepare

    Contracts, purchase orders, commissioning certificates, handover sign-off, project margin and debtor ledger.

  3. 3

    Common blockers

    Uncommissioned work, connection delays, performance guarantees and excessive customer concentration.

Practical funding fit

Structure follows the point at which value becomes evidenced.

Funding is strongest once an installation is commissioned and signed off, not while it awaits testing or connection.

Check eligibility

Practical context

Energy invoices depend on commissioning, not just issue date.

Energy and renewables businesses often buy panels, inverters, batteries or plant well before a project is installed, tested and handed over. That means the real funding evidence may include supplier orders, installation records, commissioning certificates, test results and customer handover sign-off - not merely a PDF invoice.

The review also needs to separate clean trade debt from work in progress, retentions, variations and payments that depend on grid connection, grants or export tariffs. Equipment deposits, specialist installers and long lead times can create pressure before a project is commissioned. A workable facility is built around the portion of the ledger that is completed, accepted and collectable.

  • Identify commissioning and sign-off requirements contract by contract.
  • Separate retentions, grants and tariff income from eligible debt.
  • Show customer concentration and project completion exposure.

Start an applicationHave the evidence above to hand.